Select Bridges Projects
- I-74 Mississippi River Crossing Between Moline, IL and Bettendorf, IA, IowaDOT District 6
- US 52 Savanna/Sabula Tied Arch bridge, IDOT District 2
- I-294 (Tri-State Tollway) Mile Long Bridge Reconstruction, Cook County, IL, Illinois Tollway
- Tied-Arch Illinois River Bridge, Meredosia, Illinois, IDOT District 6
- Cedar Street Bridge over Illinois River, Peoria, IL, IDOT District 4

US 52 Savanna/Sabula Tied Arch Bridge, IDOT District 2
Participated in the inspection and documentation of the construction of this $70M dollar project currently underway. The project includes construction of a new tied arch bridge on new alignment, causeway construction, and removal of the old steel through truss bridge. Also, responsible for inspection of the work and for material and quantity certification.
Check out the video of construction below: