Surveying

Service Contact: Bill Kenter

PTB 149/21, Phase I/II Engineering services for Various Projects/Various Counties, IDOT District 4

Performed surveys of I-74 bridges over Henderson Creek and Pope Creek.


PTB 152/26, Phase I/II Engineering services for Various Projects/Various Counties, IDOT District 6

Performed property research for 10 miles of IL Rte 16 in Macoupin County.


City of Galesburg

Developed plats for Mainstreet overpass over BNSF RR.


PTB 151-28, Various Surveying Projects/Various Counties, IDOT District 2

Developed monument records for 130+ section corners.


Street Maintenance Program, City of Champaign

Performed Survey Services that included the topographic, drainage and existing right of way surveys of Newbury Rd. from Robert Dr. to Glen Dr., Winston Dr. from Summit Ridge Road to Williamsburg Dr., Thornton Dr. from Williamsburg Rd. to Hedge Rd., and Hedge Rd. from Thornton Dr. to Mattis Ave., Eureka St. from Hickory St. to Market St. and Champaign St. from Eureka St. to Beardsley Ave. Each of the surveys was performed based on the Illinois Department of Transportation survey requirements.


PTB 147/20, Phase I/II for US 34 from West of Gletty Road at Sandwich to Chilton Way in Plano, Dekalb and Kendall Counties, IDOT District 3

Performed Survey Services that included field survey, right of way plats and plans, draft existing ROW for mainline, drafting existing topography and handling automated and manual traffic counts.


PTB 149/21, Phase I/II Engineering services on US 67 over Henderson Creek, Mercer County, IDOT District 3

Performed Survey Services that included field survey of roadway and bridge, including establishment of right of way, topography and hydraulic survey.


PTB 146 ITEM # 26 Phase I/II Engineering Services on IL 78 for structure replacement over Indian Creek (S.N. 037-0072) in Henry County

Performed Survey for existing structure, topographical survey for existing area as well as flood plain survey.


Valley Tree Estates Subdivision

Performed Boundary Survey and Topographical Survey for Design of Proposed Subdivision Design.


IDOT January 15 Letting, 2010, Item 127, Logan County

Provided Construction Layout for bridge replacement on IL Rte 10.


IDOT January Letting, 2010, Item 269, Macon County

Provided Construction Layout for Stevens Creek Bikeway in District 7.


IDOT August 1st Letting, 2009, Item 40, New Berlin, IL

Provided Construction Layout for replacement of the existing single slab box culvert on Old 36.


IDOT June 13th Letting, 2009, Item 104

Provide Construction Layout for Harrison Ave.-Mulford/Perryville project.


IDOT April 25th Letting, 2009, Item 1A

Provide Construction Layout for Rakow/Pyott Road, Crystal Lake at the Lake in the Hills Airport project.


IDOT January 18th Letting, Item 74

Provide Construction Layout for triple barrel R.C. box culvert with necessary approach roadway on East Main Street in Rochester.


IDOT January 18th Letting, Item 142

Provide Construction Layout for removal and replacement of the existing precast, prestressed concert deck beam superstructures of the bridges carrying U.S. Route 136 over Prairie Ditch Creek and over Prairie Creek project.


Various Survey’s with Plats, Various Locations in Illinois

Performed survey research, boundary survey and legal descriptions.


CNRR Bridge Survey, Lansing, Michigan

Performed Survey for Railroad Bridge Replacement near Lansing, Michigan. Included setup, control, and topography of existing structure.


De Kalb - Taylor Airport, De Kalb, IL.

Aerial Control Survey for De Kalb - Taylor Airport.


Mt. Vernon Airport, Mt. Vernon, IL.

Aerial Control Survey for the Mt. Vernon Airport.